The project is generally described as the design, permitting, bidding and construction phase services for the installation of a 12 inch water main loop.
Premiere Design Solutions services include:
-
Design development phase: prepare 60% design documents, draft technical specs, perform utility conflict analysis, engineer's probable construction cost
-
Construction documents development phase: prepare 100% plans, prepare final tech specs, engineer's probable construction cost
-
Permit processing: preparation and submission of permit applications
-
Bidding and award services: review and respond to pre-bid questions, assist in addendum preparation and distribution, review and recommendation of Bid/Award
-
Construction phase services: Shop drawing review, RPR services, review RFI's, as-built reviews, final certification and close outs, record drawings